Archive visualisation from the original announcement, not a photograph of an open attraction. Status checked on 15 November 2026.
What the designer confirms
White Arkitekter announced that its True Blue proposal won a competition in June 2020. It concerned a new beach and park in Bergen, including a floating bathing facility concept. That describes a competition proposal, not the opening of a separate spa complex.
How the area is developing
The municipality is carrying out the Bystrand og ny Lungegårdspark project beside Store Lungegårdsvannet. Its description includes a beach, a coastal path and green spaces. The current municipal project and an impressive old visualisation should not be treated as identical visitor offerings.
The timetable in the update
A municipal report on autumn 2026 work describes sand preparation and the start of first-phase construction in winter 2027. The target for completing the beach, Lungegårdsplassen and part of the coastal path is summer 2027. This is a construction-phase target, not a promise that every element of the original competition proposal will be ready.
Using the information for an outing
Before travelling, check the municipal page and access to the particular section you want to visit. Do not treat a construction site as a public recreation area, and respect barriers. If you want a bathing facility or spa, seek separate confirmation of an operating venue, its address and admission arrangements rather than relying on an old architectural announcement.
Why a visualisation is not enough
The archive image in this article shows an idea from the earlier publication. It does not establish the present availability of pools, kayak hire or visitor access. For a relaxed city visit, it is more useful to know where you can actually walk and which waterfront areas are still being developed.